KNPC : Steam Tracing Package - Design & Detailed Engineering.
Duration : 16400 hrsKNPC : Contro Tracing Package - Design & Detailed Engineering.
Duration : 8000 hrsKNPC : Bhilosa Industries Pvt. Ltd - Condensate recovery system.
Duration : 16400 hrsFabrication Drawings of Pipe Rack - 650 + Tonnage
Duration : 2700 hrsLine Diagram for existing Chemical plant.
Duration : 480 hrs