Completed Projects
KNPC (Forbes Marshall Pvt.Ltd.)
▪ Steam Tracing Design & Detailed Engineering.
▪ KNPC Contra Tracing – Design & Detailed Engineering.
▪ KNPC Contra Tracing – Design & Detailed Engineering.
Bhilosa Textiles(Forbes Marshall Pvt. Ltd.)
▪Design & Engineering of Steam & Condensate
Recovery System.
IOCL Mathura (Forbes Marshall Pvt. Ltd.)
▪Design & Engineering of Steam & Condensate
Recovery System..
Tata Consulting Engineer – Mumbai
▪Piping and Equipment Modelling using PDMS. Fire Fighting System Design for Commercial towers -14
floors, 4 towers.
SNC Lavalin – Mumbai
▪ 3D Modelling in CADWorx.
▪ Preparation of Piping Material Specification.
Hydac India Ltd. (JSW Pvt. Ltd.) – Mumbai.
▪ Detail Engineering of interconnecting Piping
Shaan Lube Equipment Pvt Ltd. (JSW Pvt. Ltd.)–Mumbai
▪ Detail Engineering of interconnecting Piping of
equipment.
BARC–Mumbai.
▪ 3D Modelling of Mechanical components.
Petrofac –Mumbai
▪ MTO activity
▪ Modelling in PDMS.
▪ Modelling in PDMS.
KKR Bose-Mumbai
▪ Detail Engineering of interconnecting Piping of
equipment.
RD Engineering -Mumbai
▪ TR Powder capacity expansion, Haldia – Detail engineering design of 2 skids.
Samarth Erectors – Navi Mumbai.
▪ Design and Fabrication drawings of structure.
▪ Design and Fabrication drawings of Pipe rack.
▪ As built of Structure at TAPS.
▪ Design and Fabrication drawings of Pipe rack.
▪ As built of Structure at TAPS.
Zeeco -Mumbai
▪PDMS Modelling of Incinerator package.
▪Stress analysis of critical lines.
▪Shop Drawings/Fabrication drawings.
▪ CADworx Modelling.
▪Stress analysis of critical lines.
▪Shop Drawings/Fabrication drawings.
▪ CADworx Modelling.
John Zink -Mumbai
▪ Stress analysis of critical lines.
GSDK- Varanasi: Starch Derivative Production Plant
▪ P&ID, PFD, 3D Modell.
▪ Plot Plan, Piping Layout.
▪ As-built Activity
▪ Plot Plan, Piping Layout.
▪ As-built Activity
Fabtech Projects & Engineers Ltd - INDIA
▪ Fabrication Drawings of Pipe Rack – 650 Tonnage
THERMAX -Pune
▪ 3D Modelling of Flue Gas Desulphurizing project on
E3D.
Shaan Lube Equipment Pvt Ltd. – Mumbai
▪ RPL (Roll Pass Lubrication System).
Samarth Erectors – Navi Mumbai.
▪ JELL Pharma - Structure detailing.
TCE -Mumbai
▪ Stress analysis of critical lines.
▪ 3D Modelling on E3D ( DEWA Project)
▪ Fire Fighting System Design
▪ 3D Modelling on E3D ( DEWA Project)
▪ Fire Fighting System Design
Shriram Cottrell Pvt. Ltd -Mumbai
▪ Assam Biorefinery.
▪ Rajasthan Refinery.
▪ Rajasthan Refinery.
APG -Mumbai
Piping Stress support Activity - Aker Power Gas- India (BR9
Expansion Project - IOCL - Barauni Refinery)
Summary:
▪ Selection of type of support.
▪ Primary & Secondary Supporting Tags.
▪ Suggestions for Civil Pipe Support & Special Support.
▪ Design of Civil & Special Support.
Summary:
▪ Selection of type of support.
▪ Primary & Secondary Supporting Tags.
▪ Suggestions for Civil Pipe Support & Special Support.
▪ Design of Civil & Special Support.
3D Modelling on E3D- Latentech ( Netherland Based Project)
(Laser Scan Model)
Summary:
▪ 3D Modelling on Laser Scan Modell.
▪ Preparation of General Arrangement Drawing.
▪ Preparation of Isometrics Drawings
▪ 3D Modelling on Laser Scan Modell.
▪ Preparation of General Arrangement Drawing.
▪ Preparation of Isometrics Drawings
GHCL –Gujarat
RBC ( Refined Bicarbonate Plant)
▪ Detailed Engineering Services
For below discipline
▪ Process Engineering.
▪ Mechanical Engineering.
▪ Civil Engineering.
▪ Piping Engineering.
▪ Detailed Engineering Services
For below discipline
▪ Process Engineering.
▪ Mechanical Engineering.
▪ Civil Engineering.
▪ Piping Engineering.
LTHE –Mumbai Phase 1
Unit: PTA-PIA
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG
BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG
BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
LTHE –Mumbai Phase 1
Unit: PX-MX
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
Sadhana Nitrochem Chemical Ltd –( SNCL)
PARA AMENO PHENOL PLANT
▪Detailed Engineering Services Summary:
•3D Modelling of Equipments.
•Issue of Equipment Layout and Isometrics.
▪Detailed Engineering Services Summary:
•3D Modelling of Equipments.
•Issue of Equipment Layout and Isometrics.
TCE –Mumbai
▪ Hassyan 120 MIGD SWRO Desalination Plant.
▪ Stress Analysis for BPCL Plant
▪ 2G Ethenol
▪ Stress Analysis for Smart CHEM Technologies.
▪ Stress Analysis for BPCL Plant
▪ 2G Ethenol
▪ Stress Analysis for Smart CHEM Technologies.
Hamon Cooling Tower Systems Pvt. Ltd.
Cooling Tower Systems
▪ Detailed Engineering Services for cooling tower area.
▪ Detailed Engineering Services for cooling tower area.
LTHE – Mumbai – Phase 2 (60% & 90% Modell)
Unit: PX-MX (No. of Lines 1000+)
▪ Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
▪ Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
LTHE – Mumbai – Phase 2 (60% & 90% Modell)
Unit: PX-MX (No. of Lines 1000+)
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
Summary:
▪ Equipment Layout
▪ Tie In Sketches & Point Schedule (775+ Tie-Ins)
▪ Study piping routing in auto cad for existing.
▪ Provide load data drawing.
▪ Study piping of new facility in SP3D.
▪ Extract Manual Piping BOM for the existing facility.
▪ Extract isometrics for stress analysis.
▪ Consolidated piping BOM for new & existing facility.
▪ Specialty BOM
▪ Work Volume (ID, IM, Insulation BOM, Painting BOM), UG BOM, Fire Water BOM, Support BOM for costing
▪ Stress Analysis
▪ SP3D Model as per RIL specification
Uzility Engineering - Uzbekistan
Safety Studies Boysun GAS GPP
Summary:
▪ Escape, Evacuation and Rescue Analysis Philosophy and Study
▪ Fire and Gas Detection Philosophy
▪ Noise Mapping Study and Philosophy
▪ Hazardous Area Classification
▪ Escape route and Safety Equipment Layout & Safety Signage Layout
▪ Vapor Cloud Explosion Study
▪ Reliability, Availability and Maintainability (RAM) Study
▪ Material Handling Study
▪ Review Report Project Design Requirements
Summary:
▪ Escape, Evacuation and Rescue Analysis Philosophy and Study
▪ Fire and Gas Detection Philosophy
▪ Noise Mapping Study and Philosophy
▪ Hazardous Area Classification
▪ Escape route and Safety Equipment Layout & Safety Signage Layout
▪ Vapor Cloud Explosion Study
▪ Reliability, Availability and Maintainability (RAM) Study
▪ Material Handling Study
▪ Review Report Project Design Requirements
Petrofac - Sharjah
Engineering Services - ETP
Summary:
▪ 3D Modelling on SP3D
▪ Piping Engineering
▪ Civil & Structural Engineering
▪ Electrical Engineering
▪ Instrumentation Engineering.
▪ Telecom Engineering.
Summary:
▪ 3D Modelling on SP3D
▪ Piping Engineering
▪ Civil & Structural Engineering
▪ Electrical Engineering
▪ Instrumentation Engineering.
▪ Telecom Engineering.