Our Business

Our Projects & Clients


M / s. Forbes Marshall Pvt.Ltd. - Pune

KNPC : Steam Tracing Package - Design & Detailed Engineering. Duration : 16400 hrs

KNPC : Contro Tracing Package - Design & Detailed Engineering. Duration : 8000 hrs

KNPC : Bhilosa Industries Pvt. Ltd - Condensate recovery system. Duration : 16400 hrs

Febtech Projects & Engineers Ltd. – India

Fabrication Drawings of Pipe Rack - 650 + Tonnage Duration : 2700 hrs






VA - SUDHA Chemicals Pvt. Ltd. – Mumbai

Line Diagram for existing Chemical plant.
Duration : 480 hrs






TCE – Mumbai

Piping and Equipment Modelling using PDMS. Duration : 1200+ Hrs

Fire Fighting System Design for Commercial towers -14 floors, 4 towers Duration : 2200+ Hrs.

KKR Bose – Mumbai

Piping and Equipment Modelling using PDMS of 3 skids of compressor packages.
Duration : 1700+ Hrs.


RD Engineering– Mumbai.

TR Powder capacity expansion, Haldia – Detail engineering design of 2 skids.
Duration : 1100+ Hrs.


SNC Lavalin – Mumbai.

3D Modelling in PDMS.
Duration : 2440+ Hrs.

Piping Specification related work.
Duration : 850+ Hrs.

Hydac India Ltd. – Mumbai.

Detail Engineering of interconnecting Piping
Duration : 4200+ Hrs.



Shaan Lube Equipment Pvt. Ltd. – Mumbai

Detail Engineering of interconnecting Piping of equipment.
Duration : 3600+ Hrs.


Samarth Erectors – Navi Mumbai.

As built of Structure at TAPS.
Duration : 860+ Hrs.

Design and Fabrication drawings of structure Duration : 940+ Hrs.

Design and Fabrication drawings of Pipe rack. Duration : 275+ Hrs.

Espoir Engineering Pvt. Ltd. – Mumbai

Design and Fabrication drawings of Dome structure Duration : 490+ Hrs






Crestive Engineers Pvt. Ltd. –Navi Mumbai

Equipment drawing preparation.
Duration : 4350+ Hrs.






Deep Enterprises – Mumbai

Design and Fabrication drawings of of Worly Mix Used Tower.
Duration : 1990+ Hrs.


BARC – Mumbai.

3D Modelling of Mechanical componants
Duration : 1200+ Hrs.



John Zink Hamworthy Combustion –Mumbai.

Instrument Engineering Services.
Duration : 400+ Hrs.


Hams Garment - Bangladesh.

P&ID Duration : 1080+ hrs

3D Modelling
Isometrics

Arihant–Mumbai.

Iso checking. Duration : 1200+ Hrs.

GA drawing Duration : 2160+ Hrs.

Looking for the Best Engineering Solution for your Project?